It is a 50m borehole for a company which involved the following stages: Explorotory drilling Electrical borhole Bore Casing and gravelling of the filter bed Development by compressor Installing the sounding head Installation of the electric pump with all safety levels (thermal, voltage, water level, phase change) Installation of a hydrometer to monitor the water table The necessary connections to link the borehole to the water tank Post navigation Previous referenceValuation study of lime stone raw material for the creation of a new cement plant